Capacity open for Q1 2027

Parts that fit the first time.

Precision machining, fabrication and assembly for OEMs — from one prototype to 250,000 parts a year.

Ø240.00 ±0.0592.006× Ø18 THRUEQ SP ON Ø184 PCDØ96 H7SECTION A–A▭ 0.02 | A⊥ 0.01 | B
PartPump flange
Dwg no.HV-M-1140
Material316L SS
Production tolerance
±0.005mm
CNC centres
64
On-time delivery
99.6%

01 Capabilities

What we make

Part families we run every week. Add any to your RFQ.

  • HV-M-0412

    Hydraulic manifold

    Material
    6061-T6 / 4140
    Tolerance
    ±0.01 mm
    Lead time
    3–4 wks
  • HV-M-0718320.0 ±0.02

    Precision drive shaft

    Material
    4340 / 17-4PH
    Tolerance
    ±0.005 mm
    Lead time
    2–3 wks
  • HV-F-2201

    Enclosure chassis

    Material
    CRS / 304 SS
    Gauge
    0.8 – 6 mm
    Lead time
    2–3 wks
  • HV-F-2350

    Mounting bracket

    Material
    A36 / 5052
    Weld cert.
    AWS D1.1
    Lead time
    10 days
  • HV-C-3104

    Pump housing

    Material
    Ductile iron
    Inspection
    RT / PT
    Lead time
    6–8 wks
  • HV-A-4010

    Linear actuator

    Components
    42 parts
    Testing
    100% functional
    Lead time
    4–6 wks
1 part in your RFQContinue to quote →

02 Process

Drawing to dock

  1. Day 0

    Send drawings

    STEP, IGES or PDF. NDA first if you need one.

  2. 48 hours

    DFM & quote

    An engineer reviews every feature for cost and risk.

  3. 2–4 weeks

    First article

    CMM inspection with a signed FAI report.

  4. Ongoing

    Production

    Scheduled, kanban or JIT. Every lot traceable.

03 Quality

Certified and traceable

Every lot traceable to the bar. Audit summaries on request.

  • ISO 9001:2015

    Valid to 03/2028

  • AS9100 Rev D

    Valid to 03/2028

  • IATF 16949

    Valid to 06/2027

  • ITAR Registered

    M-38812

04 Facilities

Three plants, one standard

342,000 ft² under a single quality system. Visits welcome.

DOCKPLAN · NOT TO SCALE

Rockford, IL

Machining

Floor
182,000 ft²
CNC centres
38
DOCKPLAN · NOT TO SCALE

Monterrey, NL

Fabrication

Floor
96,000 ft²
Lasers
4 × 12 kW
DOCKPLAN · NOT TO SCALE

Greenville, SC

Assembly

Floor
64,000 ft²
Clean room
ISO 8

05 Request a quote

A real price in 48 hours.

A named engineer reviews every RFQ. Minimum order: one piece.

+1 (815) 555-0199
rfq@halvorsen-industrial.com

Parts in this RFQ01
  • HV-M-0412 · Hydraulic manifold

Confidential. NDA available before upload.